== Completed Projects ==
* Replace Workshop extension leads with durable, 13a rated leads suitable for a workshop environment▼
* Replace Workshop fluorescent tubes with LED low energy tubes▼
* Replace Bay fluorescent lights with LED low energy lights▼
* Replace Lobby fluorescent lights with LED ceiling panel▼
* Replace Main room fluorescent lights with LED ceiling panels▼
* Replace Laser room fluorescent lights with LED ceiling panels▼
* Rewire Laser room. Install data cabling to both walls
▲* Replace Workshop extension leads with durable, 13a rated leads suitable for a workshop environment
* Install new lighting in Kitchen. Ceiling lights and under-cupboard lighting▼
* Install new ring main for the electronics benches, plus data cabling▼
* Install new ring main in the Workshop for the east wall, plus data cabling. Add points for lathe worklight and extractor fan▼
* Install new sub-board in the Kitchen for upstairs power
* Install new circuits in the Kitchen for the fridge, microwave, dishwasher etc
* Remove old circuit from the building signage - we don't have an illuminated sign
▲* Install new lighting in Kitchen. Ceiling lights and under-cupboard lighting
* Re-fit LoRaWAN gateway with power feed to upstairs cupboard▼
* Replace UPS for the 3d printers - need to support a second printer▼
* Replace batteries in data rack UPS▼
* Install new radial circuit in the upstairs cupboard for fume extract and future data closet
▲* Replace Workshop fluorescent tubes with LED low energy tubes
▲* Replace Bay fluorescent lights with LED low energy lights
▲* Install new ring main in the Workshop for the east wall, plus data cabling. Add points for lathe worklight and extractor fan
* Tidy up old power and data cabling between Main room and Workshop▼
▲* Replace Main room fluorescent lights with LED ceiling panels
▲* Install new ring main for the electronics benches, plus data cabling
* Remove wall-mounted extension leads from Workshop and fit metal-clad sockets on the ring main
* Install 16A extention socket from bandsaw to center pillar for MIG welder use
* Tidy up power for the Workshop inspection microscope
▲* Replace Laser room fluorescent lights with LED ceiling panels
▲* Replace Lobby fluorescent lights with LED ceiling panel
* Install frost protection heaters in both toilets
* Install
▲* Tidy up old power and data cabling between Main room and Workshop
▲* Re-fit LoRaWAN gateway with power feed to upstairs cupboard
▲* Replace UPS for the 3d printers - need to support a second printer
▲* Replace batteries in data rack UPS