Project/ElectricalWorks: Difference between revisions

imported>Jmf
imported>Jmf
Line 26:
 
== Completed Projects ==
* Replace Workshop extension leads with durable, 13a rated leads suitable for a workshop environment
* Replace Workshop fluorescent tubes with LED low energy tubes
* Replace Bay fluorescent lights with LED low energy lights
* Replace Lobby fluorescent lights with LED ceiling panel
* Replace Main room fluorescent lights with LED ceiling panels
* Replace Laser room fluorescent lights with LED ceiling panels
* Rewire Laser room. Install data cabling to both walls
* Replace Workshop extension leads with durable, 13a rated leads suitable for a workshop environment
* Install new lighting in Kitchen. Ceiling lights and under-cupboard lighting
* Install new ring main for the electronics benches, plus data cabling
* Install new ring main in the Workshop for the east wall, plus data cabling. Add points for lathe worklight and extractor fan
* Install new sub-board in the Kitchen for upstairs power
* Install new circuits in the Kitchen for the fridge, microwave, dishwasher etc
* Remove old circuit from the building signage - we don't have an illuminated sign
* Install new lighting in Kitchen. Ceiling lights and under-cupboard lighting
* Re-fit LoRaWAN gateway with power feed to upstairs cupboard
* Replace UPS for the 3d printers - need to support a second printer
* Replace batteries in data rack UPS
* Install new radial circuit in the upstairs cupboard for fume extract and future data closet
* Replace Workshop fluorescent tubes with LED low energy tubes
* Replace Bay fluorescent lights with LED low energy lights
* Install new ring main in the Workshop for the east wall, plus data cabling. Add points for lathe worklight and extractor fan
* Tidy up old power and data cabling between Main room and Workshop
* Replace Main room fluorescent lights with LED ceiling panels
* Install new ring main for the electronics benches, plus data cabling
* Remove wall-mounted extension leads from Workshop and fit metal-clad sockets on the ring main
* Install 16A extention socket from bandsaw to center pillar for MIG welder use
* Tidy up power for the Workshop inspection microscope
* Replace Laser room fluorescent lights with LED ceiling panels
* Install fused outlet in Workshop for the auto dust extractor on the bandsaw
* Replace Lobby fluorescent lights with LED ceiling panel
* Install frost protection heaters in both toilets
* Install 16Afused extentionoutlet socketin fromWorkshop bandsawfor tothe centerauto pillardust forextractor MIGon welderthe usebandsaw
* Tidy up old power and data cabling between Main room and Workshop
* Re-fit LoRaWAN gateway with power feed to upstairs cupboard
* Replace UPS for the 3d printers - need to support a second printer
* Replace batteries in data rack UPS
 
== Reference Information ==
Anonymous user