The Main Electrical panel is where power comes into rLab, and we use a lot of power! The wiring is being updated at the moment so this page was accurate as of
[[File:mainelectricalpanel.jpg|thumb|400px]]
The main incoming feed is bottom left on the panel, which goes through the power company fuses and meter and into the large master isolator switch on the left. This interrupts all power in the entire hackspace when used. The maser isolator feeds the 3-phase distribution board, the single-phase distribution board and the 63A 3-phase special purpose socket. The 3-phase distribution board then goes on to feed special-circuits 3-phase board which powers the [[Tools/metallathe|lathe]] and the
{| class="wikitable"
Line 28:
Feeds
* Loading bay lights
* Laser room lights
Line 34 ⟶ 33:
* Fire Alarm
* E-stop control loop
* DB-3A
* [[Tools/metallathe|Lathe]]
Line 66 ⟶ 64:
Fed From - 3-Phase main distribution unit
Feeds
* Pillar Drill
* Pedestal Grinder
* 16A socket on west pillar
* 16A socket on east pillar
|| [[File:DB3A.jpg|200px]]
|-
Line 72 ⟶ 74:
Fed From - 3-Phase main distribution unit
Feeds - Interrupts the power supply to DB-1A and DB-3A
|| [[File:Estopsystem.jpg|200px]]
|-
| '''3 Phase
Fed From
* 63A Socket - Main Isolator
|| [[File:3phaseoutlets.jpg|200px]]
|}
|