imported>Jmf (Created page with "== Introduction == A project to cover the electrical works in the Main Room refit. Clear the east wall, install a plywood skin, then install four work stations with power and...") |
imported>Stever No edit summary |
||
Line 2:
A project to cover the electrical works in the Main Room refit.
Clear the
Objectives :
* Replace the existing
* Move the circuit feed onto the kitched distribution board
* Maintain power for the heat pump
Line 16:
The existing sockets are connected to a 32A ring main, wired back to the Main Board.
The extractor fan is connected via a switch-fused connection unit, which then feeds a
A 20A circuit from DB2 connects to an isolator for the heat pump.
Line 23:
* Test the circuit is not feeding the Server Rack in the cupboard.
* Identify cable route from ceiling into back of new plywood wall
* Arrange
* Disconnect the existing sockets and data cabling, and remove back to the Main Board.
* Disconnect and remove the extractor fan wiring. Install extra cable to the fan to allow for fitting behind the plywood wall and into the dado trunking
|