Project/ElectricalWorks/MainRoomRefit: Difference between revisions

no edit summary
imported>Jmf
(Created page with "== Introduction == A project to cover the electrical works in the Main Room refit. Clear the east wall, install a plywood skin, then install four work stations with power and...")
 
imported>Stever
No edit summary
Line 2:
A project to cover the electrical works in the Main Room refit.
 
Clear the eastwest wall, install a plywood skin, then install four work stations with power and data.
 
Objectives :
* Replace the existing EastWest Wall mounted sockets with sockets in dado trunking on the new wall.
* Move the circuit feed onto the kitched distribution board
* Maintain power for the heat pump
Line 16:
The existing sockets are connected to a 32A ring main, wired back to the Main Board.
 
The extractor fan is connected via a switch-fused connection unit, which then feeds a seperateseparate speed controller and out to the fan itself.
 
A 20A circuit from DB2 connects to an isolator for the heat pump.
Line 23:
* Test the circuit is not feeding the Server Rack in the cupboard.
* Identify cable route from ceiling into back of new plywood wall
* Arrange temporaytemporary power for the Design PC's and 3d printers. Need 8 sockets. 2 x 4-gang leads from Electronics benches ?
* Disconnect the existing sockets and data cabling, and remove back to the Main Board.
* Disconnect and remove the extractor fan wiring. Install extra cable to the fan to allow for fitting behind the plywood wall and into the dado trunking