Donations: Difference between revisions
Content added Content deleted
imported>Stever |
imported>Stever |
||
Line 52: | Line 52: | ||
* An induction furnace capable of melting steel (we have 3-phase power up to 63A available) |
* An induction furnace capable of melting steel (we have 3-phase power up to 63A available) |
||
* A high speed belt grinder (2x36" or 2x72" ideal) |
* A high speed belt grinder (2x36" or 2x72" ideal) |
||
* A CNC milling machine that's larger/more capable than our [[Tools/boxford|boxford]] |
* A CNC milling machine that's larger/more capable than our [[Tools/boxford|boxford]], Ideally something along the lines of a Tormach 770 |
||
* A 6-jaw chuck for the lathe, it takes a D1-4 fitting |
* A 6-jaw chuck for the lathe, it takes a D1-4 fitting |
||
* Air-fed welding hood |
* Air-fed welding hood |