Line 5: | Line 5: | ||
|- | |- | ||
| | | | ||
- | * [[User:Stever/Projects/TTLF|Test-tube light fixture]] | ||
|| | || | ||
* Making a Hydraulic press to assist with using the [[Tools/forge|Forge]] and making damascus steel | |||
* Document all [[induction|inductions]] and get people willing to give them, special focus from me on the [[Tools/castingcrucible|casting crucible]] | |||
* Fix Induction furnace and get it ready for use, write induction, start workshops involving it | |||
|} | |} | ||
Line 16: | Line 18: | ||
|- | |- | ||
| In Progress || || | | In Progress || || | ||
* Open up hydraulic control valve | |||
|- | |- | ||
| Eventually || | | Eventually || | ||
* Make engineer's cube demo | * Make engineer's cube demo | ||
|| | || | ||
* New casting box | |||
* Improved [[Tools/pillardrill|Drill]] speeds sticker | |||
* Long focus [[Tools/laser|laser]] lens system | |||
* New rubber pad to hold chisels into chisel rack | |||
* Overhaul [[Tools/pedgrinder|pedestal grinder]] | |||
* Make [[Tools/plasma|plasma cutter]] torch stand-off | |||
* Make pressure test fittings for [[Tools/compressor|compressor]] | |||
* Make split and planar coils for induction heater | |||
* Sort out air lines, replace bad ones | |||
* Design/Make new hard-jaws for main vice | |||
|} | |} | ||
Revision as of 06:47, 27 April 2022
Major Projects in Progress
For me | For rLab |
---|---|
|
Odd jobs that need doing around the lab
Status | For me | For rLab |
---|---|---|
In Progress |
| |
Eventually |
|
|
Projects I'm considering for the future
For me | For rLab |
---|---|
|
|
Random Stuff
- User:Stever/Notes/Weldguide Which welding technique should I be learning?
- User:Stever/boxford/speedsnfeeds Tested Speeds and Feeds for the Boxford
- User:Stever/facilities/nb
Projects completed
Major Projects
For me | For rLab |
---|---|
|
|
Odds and Ends
- Laser cutter Beam realigned, all mirrors and lens cleaned, rails cleaned and relubricated. 14:08, 3 January 2022 (UTC)
- Realign lathe tailstock to remove taper 18:51, 4 January 2022 (UTC)
- Fix cable on heat gun 22:10, 5 January 2022 (UTC)
- Fix fence on bandsaw, remake and fit slider pad so it grips properly 22:10, 5 January 2022 (UTC)
- Readjust motor slides on drill press, lubricate and clean rails 17:14, 6 January 2022 (UTC)
- Modify old JET type filters to fit into Laguna air filter unit 16:37, 10 January 2022 (UTC)
- Re-dress tool rest bar on wood lathe 16:38, 10 January 2022 (UTC)
- Rebuild record power SC-4 chuck, looks like someone was cranking it open a bit too hard. 22:41, 11 January 2022 (UTC)
- Redressed fine grinding wheel 08:55, 22 January 2022 (UTC)
- Resharpen all the blunt drill bits 11:48, 25 January 2022 (UTC)
- De-cobweb the CCTV cameras 08:18, 26 January 2022 (UTC)
- Fit spindle current gauge to boxford and readjust the spindle controller for better response and stability 17:56, 26 January 2022 (UTC)
- Fix failed table lock mechanism on table saw by re-making failed part 17:59, 27 January 2022 (UTC)
- Design and fit new feet to table saw 22:35, 4 February 2022 (UTC)
- Change sanding disc on large linisher 13:58, 12 February 2022 (UTC)
- Get & fit working toilet roll holder for second toilet. 14:43, 15 February 2022 (UTC)
- Tighten column clamp on pillar drill to reduce play, spindle bearings still require replacement 15:16, 20 February 2022 (UTC)
- Fit new 40T blade to the table saw 14:15, 21 February 2022 (UTC)
- Replace left-hand side lid sensor on Laser cutter 19:00, 10 March 2022 (UTC)
- Obtain and install new small linisher 10:10, 13 March 2022 (UTC)
- Install new forge linings (with the help of Andy-J and Andy-C) 22:37, 13 March 2022 (UTC)
- Adjust stability control on Boxford to remove oscillation 18:15, 21 March 2022 (UTC)
- Redesign, reprint and fit replacement coolant line adaptor on metal lathe 12:02, 23 March 2022 (UTC)
- Fit new carpet strip on the flooring joins near the entrance, with Mike-M 13:08, 23 March 2022 (UTC)
- Fix one of the blue Scheppach vacuums by fitting new motor 14:54, 30 March 2022 (BST)
- Change blade on vinyl cutter, old one was chipped 14:43, 31 March 2022 (BST)
- Make new decal for propane forge that reminds about basic settings 16:44, 1 April 2022 (BST)
- Relevelled bed on 0.4mm printer, cleaned and re-lubed the axis rods. 16:44, 1 April 2022 (BST)
- Change ceramic filter and empty solder capsule on desoldering gun 19:08, 1 April 2022 (BST)
- Fix electronic load unit 15:58, 2 April 2022 (BST)
- Laser Cleaning, beam profile testing, tube realignment, beam path realignment, mirror replacement, lens replacement, filter replacement, bed leveling, focus testing and adjustment, relubrication. With Ru 17:12, 9 April 2022 (BST)
- Replace sanding disc on large linisher 22:41, 10 April 2022 (BST)
- Adjust configuration on 0.4mm printer to compensate for worn feed roller 22:20, 15 April 2022 (BST)
- Make and fit another new coolant line adapter on metal lathe, trying PETg this time to see if that works better 22:20, 15 April 2022 (BST)
- Replace failing belts on drill press 12:18, 22 April 2022 (BST)
- Remove used needles from fire escape, think I got them all 12:42, 25 April 2022 (BST)
- Fix HDD issue on CCTV 15:23, 25 April 2022 (BST)
- Fix other blue Scheppach vacuum 15:13, 26 April 2022 (BST)